GATE 2018 Architecture and Planning (AR) question paper and answer key
#1
GATE 2018 Architecture and Planning (AR) solved question paper

1.In Critical Path Method (CPM) for time scheduling, ‘forward pass calculation’ is carried
out for determining
(A) Late start and early finish time (B) Early start and early finish time
© Late start and late finish time (D) Early start and late finish time

2.In mass transportation, LRTS stands for
(A) Light Rail Transit System
(B) Linear Rail Transit System
© Light Rail Transportation System
(D) Linear Rail Transportation System

3.Assuming other variables remaining constant, the Tropical Summer Index
(A) Increases with increase in air velocity
(B) Decreases with increase in wet-bulb temperature
© Decreases with increase in globe temperature
(D) Increases with increase in vapour pressure

Detailed GATE 2018 Architecture and Planning (AR) solved question paper can be downloaded from the link attached


Attached Files
.pdf   GATE 2018 Architecture and Planning (AR) Question Paper.pdf (Size: 612.54 KB / Downloads: 300)
Reply
#2
GATE 2018 Architecture and Planning (AR) answer key


Attached Files
.pdf   GATE 2018 Architecture and Planning (AR) answer key.pdf (Size: 60.5 KB / Downloads: 160)
Reply
#3
Plz add 2018 question papers
Reply


Possibly Related Threads...
Thread Author Replies Views Last Post
  GATE XL- Life Sciences Solved Question paper with answer key luttu 9 14,462 9 hours ago
Last Post: nitinps
  GATE 2018 Life Sciences (XL) Question Papers with answer key kalyanasundari 4 1,111 9 hours ago
Last Post: nitinps
  GATE 2019 XL - Life Sciences Question Paper and Answer key kalyanasundari 3 337 9 hours ago
Last Post: nitinps
  GATE 2019 XE - Engineering Sciences Question Paper and Answer key kalyanasundari 4 256 9 hours ago
Last Post: nitinps
  GATE 2018 Engineering Sciences (XE) Question Papers with answers joshyjoy 4 1,180 9 hours ago
Last Post: nitinps



Users browsing this thread: 1 Guest(s)